I am using unattended-upgrades across multiple servers. I would like package updates to be rolled out gradually, either randomly or to a subset of test/staging machines first. Is there a way to do that for APT on Ubuntu?

An obvious option is to set some machines to update on Monday and the others to update on Wednesday, but that only gives me only weekly updates…

The goal of course is to avoid a Crowdstrike-like situation on my Ubuntu machines.

edit: For example. An updated openssh-server comes out. One fifth of the machines updates that day, another fifth updates the next day, and the rest updates 3 days later.

  • remram@lemmy.mlOP
    link
    fedilink
    arrow-up
    2
    arrow-down
    1
    ·
    5 months ago

    Which distro is image based and have the staggered rollout feature I’m after?

    • GravitySpoiled@lemmy.ml
      link
      fedilink
      English
      arrow-up
      5
      ·
      5 months ago

      You don’t need the staggered rollout since it won’t boot into a broken image and you can boot easily into an old one if you don’t like the new one. E.g. fedora atomic.

      I’m not up to date with vanilla os for the debian world if it is on par with fedora.

      • remram@lemmy.mlOP
        link
        fedilink
        arrow-up
        3
        ·
        5 months ago

        I am not worried about upgrades so bad that they literally don’t boot. I am worried about all the possible problems that might break my service.

          • remram@lemmy.mlOP
            link
            fedilink
            arrow-up
            2
            ·
            5 months ago

            I can roll back with APT too, my question is how to do the staggered rollout.

            • GravitySpoiled@lemmy.ml
              link
              fedilink
              English
              arrow-up
              1
              ·
              5 months ago

              You have to reboot for an image update. Hence, you can update the computers at different times and days.

              • remram@lemmy.mlOP
                link
                fedilink
                arrow-up
                2
                ·
                5 months ago

                This doesn’t seem to enhance my workflow at all. Seems I now would have to reboot, and I still need to find a separate tool to coordinate/stagger updates, like I do now. Or did I miss something?

            • GravitySpoiled@lemmy.ml
              link
              fedilink
              English
              arrow-up
              1
              arrow-down
              1
              ·
              edit-2
              5 months ago

              If the os works always (atomic image based distro), and the docker container work, and both can roll back easily. What else could go wrong?

              Don’t overthink it :)

      • umami_wasabi@lemmy.ml
        link
        fedilink
        arrow-up
        1
        ·
        5 months ago

        No, OP absolutely still need staggered rollout. Immutable distros are a blue-green deployment self-contained. Yet, all the instance can upgrade and switch all at once and break all of them. OP still need some rollout strategy externally to prevent the whole service being brought down.