[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • Adanisi
    link
    fedilink
    English
    arrow-up
    3
    arrow-down
    3
    ·
    7 months ago

    Thoughts on CO from malfunctioning boilers?

      • Adanisi
        link
        fedilink
        English
        arrow-up
        5
        ·
        edit-2
        7 months ago

        Boilers were, in fact, mentioned earlier. And have a failure mode where CO builds up for and is undetectable without an alarm. Just like the oh so dangerous nuclear. Where’s your condemnation of boilers?

        Fun fact: coal plants emit more radioactive waste per unit energy than nuclear plants, and its just vented into the atmosphere!

        I swear people run on emotion only when nuclear is brought up.