• abraxas@lemmy.ml
    link
    fedilink
    English
    arrow-up
    2
    ·
    1 year ago

    Of course. That happens. Luckily, we have countries like China with less red tape to use to measure. They’ve been building a lot of nuclear and solar. Their end-to-end solar looks like around $750M per GW (possibly including storage? Not sure. About $2.2B for a 3.3GW plant). Looks like they’re spending about $5B per GW of nuclear.

    Sorry I don’t have the solar reference anymore. I was building a math equation for another comment and realized they weren’t talking price, so scrapped it without thinking.

    Since those numbers seem to match US figures, I think people in the Western World forget that a lot of bid cost increases or “escalations” are due to the fact that companies try to low-bid to win the contract, knowing every little inconvenience will require a cost increase. It evens out more than people want to admit.

    • PersnickityPenguin@lemm.ee
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 year ago

      Yeah I hate dealing with that. Then they send back every design decision to be reopened, resulting in literally years the meetings to decide which source for which equipment, all the while the Costco up to the point where if we just built a damn thing 5 years ago then it would have been cheaper than trying to go with a low bid now. Not to mention years of delays.

      • abraxas@lemmy.ml
        link
        fedilink
        English
        arrow-up
        1
        ·
        1 year ago

        Agreed. It doesn’t end up saving a penny, but it definitely leads to greased wheels along the way and richer politicians.