First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • LouNeko@lemmy.world
    link
    fedilink
    English
    arrow-up
    4
    arrow-down
    1
    ·
    1 year ago

    We don’t necessarily have to use batteries. In mountainous regions we already have stations that use surplus power to pump water up a mountain and then drop it down to generate energy when needed. Its basically a potential energy battery. But this is usually location limited and more expensive to set up.

    • BastingChemina@slrpnk.net
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 year ago

      Yes, Pump Storage Hydroelectricity is a great option for storage. It’s not the most efficient but it allows to store massive amount of energy.

      I think today it’s the main utility scale storage solution in the world.

    • charles@lemmy.world
      link
      fedilink
      English
      arrow-up
      0
      arrow-down
      6
      ·
      1 year ago

      You’re describing dams, and basically all the good locations are taken already.

        • AgentOrange@lemm.ee
          link
          fedilink
          English
          arrow-up
          3
          arrow-down
          1
          ·
          1 year ago

          Tbf that would be two dams and they did use the plural of dams, technically ‘dams’ could be a pumped storage facility.

          • grue@lemmy.world
            link
            fedilink
            English
            arrow-up
            1
            ·
            1 year ago

            To be even fairer, his central point that “all the good locations are taken already” only applies specifically to the regular type of dams that don’t use pumped storage. For traditional hydroelectricity you need an easily-dammed-off hilly basin containing a large/high hydraulic head river, but for pumped-storage you just need the hilly basin.