First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.
To your point: https://www.theguardian.com/environment/2022/oct/30/its-got-nasty-the-battle-to-build-the-uss-biggest-solar-power-farm https://vaenergyconsumer.com/lawsuit-aims-to-stop-massive-solar-array/ https://www.desertsun.com/story/news/environment/energy-water-summit/2017/04/21/environmentalist-just-killed-wind-farm-near-las-vegas/305796001/ https://apnews.com/article/technology-government-and-politics-environment-and-nature-las-vegas-nevada-9bf3640dfefbc6f7f45a97c6810f5ff7
Wind and Solar struggle greatly with “not in my backyard”. Of course, so too with Nuclear, and even more extreme with Nuclear, but you are correct that solar and wind have challenges with getting going.
These days EVERYTHING has like 10 lawsuits attached to it before anything can happen. Then we wonder why everything is always at a stand-still. We had a local brwery and pub in a perfect location get sued because the restuarant next door (which is kind of run down) was afraid of the competition. Now the Brewery is actually considering pulling out. Such BS especially the influx of people coming to the area would probably end up helping both businesses.