First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.
It’s from this article: $35 billion spent / 1.1GW output = $31.8/watt
I think $31 billion would have been the more accurate number to use. There wouldn’t the same contractor buyout thing for every reactor.
It was actually $27.3 billion because the journalist was an idiot and couldn’t do math.
Sorry, what article?
The article this post is about did you read the link?
I do not see any link
The article this post is about.